the breakers are standard single pole 20 amp siemens breaker. my issue was that I had used a 20A breaker for 19.6 Amp sustained draw across 3 motors and starting amps are higher.  with lots of starting and stopping any 20amp is doomed. (Its a insulation machine for retro insulating houses) so in the end I picked up a 25amp and it resolved the issue. also note though that I upped the gauge of wire used (to be safe)<div>
but if you ask any electrician they will tell you how "soft" breakers can get. </div><div><br></div><div><br></div><div>to measure the current I used a logging multimeter and custom/diy current transducer. :)</div>
<div><br></div><div><br><br><div class="gmail_quote">On Mon, Jul 23, 2012 at 5:38 PM, Richard Houser <span dir="ltr"><<a href="mailto:rick@divinesymphony.net" target="_blank">rick@divinesymphony.net</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><p>You must have crap breakers.  They should last a lot better than that.  How did you measure the current anyhow?</p><div class="HOEnZb">
<div class="h5">
<div class="gmail_quote">On Jul 23, 2012 3:56 PM, "Peter Christenson" <<a href="mailto:pac1.mi@gmail.com" target="_blank">pac1.mi@gmail.com</a>> wrote:<br type="attribution"><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">

sorry Clay didn't mean to just send this to just you.<div><br><div>although I don't post here much. I can tell you from personal experience. go with a new beaker, if you trip the breaker to many times it will start to get "soft" and trip under less load. I have fried 3 20amp breakers do to tripping them. on the last one I tested the trip load on it from trip 1 to failure, and after about 10 trips it was down to 19.5 amps, 50 trips was down to 16 amps. 62 trips was the failure.  don't know if this random info helps but load balancing helps a lot!!</div>


<div><br></div><div>Peter.</div><div><br><div class="gmail_quote">On Mon, Jul 23, 2012 at 3:39 PM, Don Bosman <span dir="ltr"><<a href="mailto:dbosman@msu.edu" target="_blank">dbosman@msu.edu</a>></span> wrote:<br>

<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
Make the mess. It's cheaper than even a small fire.<span><font color="#888888"><br>
<br>
Don Bosman</font></span><div><br>
<br>
On 7/23/2012 3:00 PM, Tom Schouten wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
Yep that's the real problem which will be fixed when (time) budget allows.<br>
Currently due to how things are setup I can't do this without making a mess...<br>
<br>
On 07/23/2012 02:32 PM, Bert W. Carrier Jr. wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
That's the point I was trying to make.  If you can add a breaker dedicated to the computer equipment, you reduce the load on the original circuit that has ACs and whatever else on it.<br>
<br>
A 15 amp breaker costs about $10 bucks, and 12 gauge wire is less than a buck per foot.<br>
<br>
</blockquote></blockquote>
<br></div><div><div>
______________________________<u></u>_________________<br>
linux-user mailing list<br>
<a href="mailto:linux-user@egr.msu.edu" target="_blank">linux-user@egr.msu.edu</a><br>
<a href="http://mailman.egr.msu.edu/mailman/listinfo/linux-user" target="_blank">http://mailman.egr.msu.edu/<u></u>mailman/listinfo/linux-user</a><br>
</div></div></blockquote></div><br></div></div>
<br>_______________________________________________<br>
linux-user mailing list<br>
<a href="mailto:linux-user@egr.msu.edu" target="_blank">linux-user@egr.msu.edu</a><br>
<a href="http://mailman.egr.msu.edu/mailman/listinfo/linux-user" target="_blank">http://mailman.egr.msu.edu/mailman/listinfo/linux-user</a><br>
<br></blockquote></div>
</div></div></blockquote></div><br></div>