[CEER Internal List 138] FW: Engineering Building Utility Shutdown Notice
Mark Urban-Lurain
urban at msu.edu
Mon Nov 23 19:13:17 EST 2015
CEER folks:
Be sure to shut down your computers Wed.
Mark
From: Jeff Curtiss [mailto:curti108 at egr.msu.edu]
Sent: Monday, November 23, 2015 4:40 PM
To: eng_all at egr.msu.edu
Cc: Greg Mason; kalwani at msu.edu
Subject: FW: Engineering Building Utility Shutdown Notice
Hello All,
This is a reminder with an additional directive. Please remember to power
down all electronics before 6:00PM.
Thank you,
Jeff
From: Jeff Curtiss [mailto:curti108 at egr.msu.edu]
Sent: Friday, November 20, 2015 4:51 PM
To: 'eng_all at egr.msu.edu'
Cc: Ceru, Robert (bobceru at ehs.msu.edu); Genevieve Cottrell; Dave Erickson;
Greg Mason (gmason at msu.edu)
Subject: FW: Engineering Building Utility Shutdown Notice
Engineering Building ONLY
From: IPF Alerts [mailto:IPFAlerts at ipf.msu.edu]
Sent: Friday, November 20, 2015 1:40 PM
To: IPF Alerts
Cc: Wilson, Todd; Williams-Swedberg, Leisa
Subject: Engineering Building Utility Shutdown Notice
FROM: Todd Wilson, Infrastructure Planning and Facilities
SUBJECT: Engineering Building Electrical Utility Work
Between 6 p.m. and 8 p.m., on Wednesday, November 25, Infrastructure
Planning and Facilities will temporarily shut down the electrical service to
the building. The emergency generator will provide minimum egress lighting
and power any receptacles fed from the standby power supply.
All ventilation for fume hoods and air circulation will be down. Please make
all necessary preparations for sealing any toxic or noxious gases. Any
computers without a UPS would need to be powered down in advance of the 6
p.m. start.
PLEASE TURN OFF ALL ELECTRONIC EQUIPMENT BEFORE 6:00PM! NOT JUST PUT IT TO
SLEEP, BUT OFF. THIS INCLUDES PRINTERS, COPIERS, MONITORS, PC'S, LAPTOPS
ATTACHED TO THE BUILDING POWER, LAB EQUIPMENT THAT IS ELECTRONIC IN NATURE,
ETC.
This work is related to Engineering Building-Chiller Replacement. For more
information about this project, visit
<http://ipf.msu.edu/construction/projects/engineering-building-chiller-repla
cement.html>
http://ipf.msu.edu/construction/projects/engineering-building-chiller-replac
ement.html
If you have any questions or concerns, contact Todd Wilson, project
representative, at (517) 927-4612 or <mailto:tdwilson at ipf.msu.edu>
tdwilson at ipf.msu.edu, or Leisa Williams-Swedberg, construction
superintendent, at (517) 230-5613, or IPF Dispatch at (517) 353-1760.
Please notify all personnel in your department. Your cooperation during this
time is appreciated.
For a complete listing of scheduled IPF maintenance and construction alerts,
visit the <http://ipf.msu.edu/news/alerts/index.html> IPF Alerts web page.
MSU Infrastructure Planning and Facilities builds and maintains the physical
environment for Michigan State University's education, research and outreach
missions, and directs the university's sustainability initiatives and
long-term infrastructure planning goals. The unit's experienced team of
professionals keeps MSU running 24/7/365, delivering an immense menu of
services and providing expert analysis for university objectives. Visit
<http://ipf.msu.edu/> the MSU IPF website for additional information, or
call (517) 353-1760 for emergency service.
<http://www.ipf.msu.edu/>
<http://www.ipf.msu.edu> ipf.msu.edu
CP13223
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.egr.msu.edu/mailman/public/ceer-internal/attachments/20151123/2036bcdc/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 3046 bytes
Desc: not available
URL: <http://mailman.egr.msu.edu/mailman/public/ceer-internal/attachments/20151123/2036bcdc/attachment.jpg>
More information about the ceer-internal
mailing list